Skip to main content
00ROI Calculator

The cost of a US seat against an India GCC seat, with the assumptions shown.

Five tools, the same inputs we use in a strategy call. Every multiplier is printed next to its result; sourced figures carry their source, the rest are labelled as indicative.

Start with the ROI calculator
01ROI calculator

What your team costs today, against the same team run from India.

Enter the team you run now and the centre you want. The result is a five-year view: annual and cumulative savings, payback, and the cost structure of the India operation.

Fig. 1 Fully loaded cost per seat, US = 100Scale: 1 unit = 1% of US cost
US operation
100
India GCC
40–50
Source: Zinnov GCC Cost Index 2024 / Everest Group
People in the operation today
Seats in the India centre
Fully loaded, per person, today
Infrastructure, tools and overhead

Method: a flat 60% reduction on salary cost, a $150,000 setup investment, and an India running cost of $25,000 per seat per year plus $200,000 fixed. Every assumption and its source is printed with the results.

02Project scoping

How long the programme runs, and what it costs to run it.

Method: base duration for the chosen timeline (4, 8 or 12 months) × complexity (1.0–1.8) × size (1.0–2.0); cost at $85,000 per programme month. Bootminds working assumption, not a quotation.

Complete the five fields for a duration, a cost and a phase plan drawn to scale. For a first single-city centre the Launch Blueprint runs 90 days; see the schedule.

03Locations

Twelve cities, side by side, from sourced data.

Choose 2 to 4 cities · 0 selected
04Talent

How deep the pool is for the skills you need, where you need them.

Software development
Data and analytics
Cloud and DevOps
Business functions

Method: a base availability index per skill, scaled by city (0.75–1.2) and by seniority (0.4–1.3), capped at 100. The index is a Bootminds hiring-desk reading, not a survey figure; salary bands are sourced.

05Compliance

What the regulatory envelope costs to build and keep.

Data handling requirements
Regulatory requirements

Method: base by company size, plus the line items ticked, × an industry multiplier (0.8–1.5). Annual maintenance is 30% of setup and audit 15%. Indicative line items from Bootminds compliance scoping, not a quotation.

99Book

Turn the estimate into a dated, priced plan.

A strategy call takes your inputs, replaces the assumptions with your numbers, and comes back with a milestone schedule and a fixed price for each phase.

or write to us